Thursday, December 3, 2009

Plumbing Design

  • Place shut-off valves in locations to avoid shutting down entire systems if one branch goes down.
  • Avoid locating equipment and valves above gyp ceilings if possible.
  • No piping over electrical rooms or data rooms/closets.
  • Indicate routing and slope of condensate lines.
  • When you are showing floor drains under ice makers or any other equipment, verify clearance underneath equipment. Verify that there is at least 3” clearance.
  • Minimum 2”ΓΈ waste or vent under slab.

No comments:

Post a Comment